STRUCT GUARD - MIO
Anticorrosive Coating for Steel Structures




- View in video
Product Rating
- Connect on WhatsApp
Anticorrosive Protective Coating
It is a two-component epoxy-based anti-corrosive treatment comprised with STRUCT GUARD- ZINC PRIMER, STRUCT GUARD-MIO and STRUCT GUARD-PU TOP.
Additional Information:
STRUCT GUARD-MIO
Technical Data | |
---|---|
Base | Epoxy Resin |
Components | Two Components |
Gloss | Semi Glossy |
Mix Proportion | Part A : Part B = 4 : 1 |
Shelf Life | 1 year in tightly sealed container |
Coverage | 6-8 sq. mtr/ltr |
Pot Life at 25°C | 4 hrs |
DFT (Dry Film Thickness) | 120-150 microns |
Curing Time | 20 hrs |
STRUCT GUARD-ZINC PRIMER
Technical Data | |
---|---|
Base | Epoxy Resin |
Components | Two Components |
Gloss | Matt |
Mix Proportion | Part A : Part B = 4 : 1 |
Shelf Life | 1 year in tightly sealed container |
Coverage | 12-15 sq. mtr/ltr |
Pot Life at 25°C | 4 hrs |
DFT (Dry Film Thickness) | 40-50 microns |
Curing Time | 24 hrs |
STRUCT GUARD-PU TOP
Technical Data | |
---|---|
Base | Acrylic Resin with Isocyanate Hardener |
Gloss | Glossy |
Mix Proportion | Part A : Part B = 6 : 1 |
Shelf Life | 1 year in tightly sealed container |
Coverage | 13-15 sq. mtr/ltr |
Pot Life at 25°C | 4 hrs |
DFT (Dry Film Thickness) | 35-45 microns |
Curing Time | 20 hrs |
- Superior Corrosion Protection – Prevents rust and oxidation, ensuring long-term durability of steel structures.
- High Chemical & Abrasion Resistance – Suitable for industrial and marine environments.
- Excellent Adhesion – Bonds strongly to steel, concrete, and other substrates, preventing delamination
- Weather & UV Resistant – Provides long-lasting protection in extreme conditions.
- High Mechanical Strength – Enhances impact resistance and structural integrity.
- Easy Application – Can be applied using a brush, roller, or spray, making it convenient for on-site applications.
- Steel structures: Bridges, buildings, towers, and pipelines.
- Chemical plants, refineries, and power plants
- Pipelines, tanks, and equipment
- Hips, offshore platforms, and coastal structures
- Water and wastewater: Treatment plants, pipes, and storage tanks

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Why Choose Struct Guard Coatings?
- Trusted by Industries Worldwide – Used in chemical plants, marine environments, and industrial structures.
- Cost-Effective & Long-Lasting – Reduces maintenance costs while extending the life of your assets.
Want to know more? Connect on WhatsApp or Request a Free Consultation!
Frequently Asked Questions (FAQs)
What is Struct Guard Coating System, and why is it important?
Struct Guard Coating System is a range of high-performance protective coatings designed for steel structures, industrial equipment, pipelines, and marine applications. It provides excellent corrosion, chemical, and abrasion resistance, extending the lifespan of assets
What are the main applications of Struct Guard coatings?
Struct Guard coatings are used in chemical plants, offshore structures, marine environments, storage tanks, pipelines, industrial buildings, and bridges. They are ideal for harsh and corrosive conditions where long-term protection is required
What are the advantages of using Struct Guard-Zinc Primer, MIO, and PU Top?
- Struct Guard-Zinc Primer: Provides strong adhesion and anti-corrosive properties, preventing steel from rusting
- Struct Guard-MIO: Acts as an intermediate barrier layer, enhancing corrosion resistance and durability
- Struct Guard-PU Top: A high-gloss acrylic polyurethane finish that offers UV, chemical, and weather resistance
What is the drying and curing time for Struct Guard coatings?
- Zinc Primer: Surface dry 4 hours, full curing 24 hours
- MIO: Surface dry 4 hours, full curing 20 hours
- PU Top: Surface dry 4 hours, full curing 20 hours
How is Struct Guard applied?
The coatings are applied using a brush, roller, or spray after proper surface preparation, which includes cleaning, rust removal, and priming. The recommended mixing ratios must be followed for optimal performance